(973) 534-2249

  Little River, SC

The Wampee Campus

Construction is underway with phase 1 and has an expected completion date of early 2025.  This great new location will be a replica of our existing Myrtle Beach, SC location buildings so tours of those existing buildings are available.  

Location

Wakeside Commercial Park’s “Wampee” campus is located in a picturesque setting only a stone’s throw away from Highway 31, Highway 9, Highway 90 and the vastly growing residential and retail communities of the North Myrtle Beach area.   Our main traffic outlet offers acceleration and deceleration lanes on Highway 31 which is important for customers, deliveries and your employees.  It is very easy to get anywhere you need to go up and down the grand strand for your business needs!

Call or Text at (973) 534-2249 or ghidellas@hotmail.com for more information or to arrange a visit.

Brochure & Map

Available Units

  • American made steel
  • 2 x 8 ft. signage
  • Impact doors & windows
  • Three- phase power
  • 18ft. roof eaves
  • 22ft. roof peak
  • Two hour firewalls
  • Floor: 5” reinforced
  • Hot water
  • Mop sink
  • Emergency Eyewash
  • Restroom w/ Shower
  • Office 25 x 10 with HVAC
  • Rollup Door 20W x 14H
  • American made steel
  • 2 x 8 ft. signage
  • Impact doors & windows
  • Three- phase power
  • 18ft. roof eaves
  • 22ft. roof peak
  • Two hour firewalls
  • Floor: 5” reinforced
  • Hot water
  • Mop sink
  • Emergency Eyewash
  • Restroom
  • Office 19 x 10 with HVAC
  • Rollup Door 12W x 14H
  • American made steel
  • 2 x 8 ft. signage
  • Impact doors & windows
  • Three- phase power
  • 18ft. roof eaves
  • 22ft. roof peak
  • Two hour firewalls
  • Floor: 5” reinforced
  • Hot water
  • Mop sink
  • Emergency Eyewash
  • Restroom
  • Rollup Door 12W x 14H
  • American made steel
  • 2 x 8 ft. signage
  • Impact doors & windows
  • Three- phase power
  • 18ft. roof eaves
  • 22ft. roof peak
  • Two hour firewalls
  • Floor: 5” reinforced
  • Hot water
  • Mop sink
  • Emergency Eyewash
  • Restroom w/ Shower
  • Office 22 x 10 with HVAC
  • Rollup Door 20W x 14H
  • American made steel
  • 2 x 8 ft. signage
  • Impact doors & windows
  • Three- phase power
  • 18ft. roof eaves
  • 22ft. roof peak
  • Two hour firewalls
  • Floor: 5” reinforced
  • Hot water
  • Mop sink
  • Emergency Eyewash
  • Restroom
  • Rollup Door 12W x 14H
  • American made steel
  • 2 x 8 ft. signage
  • Impact doors & windows
  • Three- phase power
  • 18ft. roof eaves
  • 22ft. roof peak
  • Two hour firewalls
  • Floor: 5” reinforced
  • Hot water
  • Mop sink
  • Emergency Eyewash
  • Restroom
  • Rollup Door 12W x 14H
  • American made steel
  • 2 x 8 ft. signage
  • Impact doors & windows
  • Three- phase power
  • 18ft. roof eaves
  • 22ft. roof peak
  • Two hour firewalls
  • Floor: 5” reinforced
  • Hot water
  • Mop sink
  • Emergency Eyewash
  • Restroom w/Shower
  • Office 24 x 10 with HVAC
  • Rollup Door 20W x 14H